Skip to content
Chatbotscape
Call Centre Helper's articles on calculating shrinkage, the shrinkage formula and what shrinkage is, and the WFM Labs wiki page on shrinkage, were read on 21 November 2026. The worked example below was recalculated independently on the same date.
Shrinkage· Support operations
Shrinkage is the share of paid agent time in which agents are not available to handle customers, because of breaks, meetings, coaching, training, holidays, sickness, lateness or system problems. Support teams use it to turn the number of agents needed at a given moment into the number of agents they must schedule.
By Chatbotscape Editorial· Methodology· Published 24 November 2026· Updated 24 November 2026

Shrinkage

Why the Rota Needs More People Than the Forecast

Quick answer: Shrinkage is paid time that agents spend away from customers. You calculate it as hours lost divided by paid hours, and you apply it by dividing the agents you need by one minus shrinkage. If a staffing formula says 10 agents must be answering chats at 11:00 and your shrinkage is 30 percent, you schedule 10 ÷ 0.7 = 14.3, so 15 people, not 13. Measure your own figure; published ranges describe large call centers, not a five-person chat team.

Where shrinkage fits in staffing

A staffing calculation such as Erlang C answers one question: how many agents must be handling contacts at a given moment to meet a target like 80 percent answered within 60 seconds. It assumes every scheduled agent is available. They are not. People take breaks, sit in team meetings, get coached, go on holiday and call in sick. Shrinkage is the correction between "agents needed on chat" and "agents on the rota". The WFM Labs wiki describes it as the largest correction between base staff from Erlang C and scheduled staff.

The formula

Call Centre Helper writes it as total hours of shrinkage, both outside and inside the center, divided by total hours available, times 100. The WFM Labs wiki uses non-productive time divided by total paid time. In plain terms:

Shrinkage (%) = hours agents are paid but not available for customers ÷ total paid hours × 100

Two choices change the result, so write them down and keep them the same every month:

  • What counts as the denominator. Paid hours is the common choice. If unpaid lunch is outside paid hours, leave it out of both sides.
  • What counts as lost. Some scheduling tools place breaks, lunches and meetings in the schedule and do not count them as shrinkage at all. An answer on Call Centre Helper's shrinkage formula page, from the AgentTime team, describes exactly that approach. Either method works if you do not count the same break twice.

Planned and unplanned shrinkage

TypeExamplesHow to manage it
PlannedPaid breaks, team meetings, coaching, one-to-ones, training, annual leave, public holidaysPut it in the schedule, ideally in quiet hours
UnplannedSickness, unplanned absence, lateness, breaks that run long, system downtimeKeep a buffer, measured from your own history

Call Centre Helper splits the same list into external shrinkage (away from the center: holidays, sickness, lateness) and internal shrinkage (at work but not on contacts: meetings, coaching, training, system downtime, helping other teams). The split matters because planned time can be moved to quiet hours, while unplanned time can only be covered.

For live chat there is one more item worth tracking: time an agent is logged in but set to away or not accepting chats, for example while writing up a long conversation. It is not a contact and not a break, and it quietly lowers how many agents the chat queue can actually route to.

Apply it by dividing, not adding

This is the mistake that leaves rotas short. Call Centre Helper's example: 70 agents needed at 30 percent shrinkage. Adding 30 percent gives 91. Dividing by 0.7 gives 100. The second is right, because shrinkage is a share of the scheduled total, not of the requirement: of 100 people, 30 percent away leaves 70 working.

Agents needed on contactsShrinkageWrong: add the %Right: ÷ (1 − shrinkage)
7030%91100
1030%1314.3, so 15
630%7.8, so 88.6, so 9

The WFM Labs wiki works the same way: 50 agents for an 80/20 service level at 30 percent shrinkage gives 50 ÷ 0.7 = 71.4, rounded up to 72. Always round up to whole people.

A worked example, checked

An invented example, not a measurement. A five-person chat team each works 40 paid hours a week, so the team has 200 paid hours. In one typical week:

ItemHoursType
Paid breaks: 2 × 15 minutes a day, 5 days, 5 agents12.5Planned
Weekly team meeting, 1 hour each5Planned
Coaching, 1 hour each5Planned
Training on a new product4Planned
One agent on leave for a day8Planned
Sickness6Unplanned
Total40.5

Shrinkage is 40.5 ÷ 200 = 20.25 percent: 17.25 percent planned (34.5 hours) and 3.0 percent unplanned (6 hours). Treat one week as a sample; Call Centre Helper suggests measuring shrinkage over a full year, because holidays and sickness rise in summer and around Christmas. For a small team, the useful output is less the single percentage than the hours: 34.5 of the 40.5 hours could have been placed in quiet hours.

For comparison, Call Centre Helper's own worked example, for a year of 260 working days and 37.5-hour weeks, adds up to 84.5 days, or 32.5 percent.

What the published ranges mean

Call Centre Helper says most contact center professionals seem to agree shrinkage usually sits between 30 and 35 percent, and cites a Dimension Data benchmarking report average of 35 percent. The WFM Labs wiki lists typical totals from 25 to 30 percent for centers under 100 agents up to 30 to 38 percent for outsourcers, marked as approximate and without a named source. These are useful sanity checks for a large phone operation. They are not a target for a chat team. A team that runs no formal training this quarter can sit far lower; a team with heavy onboarding can sit higher. Measure your own.

Shrinkage also varies within the day. Call Centre Helper notes it tends to peak in the mid-morning and early afternoon, when meetings are usually booked. For a chat team, those are often the busy hours, which is why the scheduling guide moves meetings out of them.

Shrinkage, occupancy and concurrency are different numbers

  • Shrinkage is time away from customers, as a share of paid time.
  • Occupancy is how busy agents are while available: workload divided by agents. See Erlang C.
  • Chat concurrency is how many chats one agent handles at once. It changes the workload, not the shrinkage.

Mixing them up produces double counting. A team that lowers its concurrency factor "for breaks" and also applies shrinkage has counted the breaks twice.

Where chatbots fit

A bot does not change shrinkage, which is about people. It changes the number shrinkage is applied to. When a bot fully answers questions, measured as your deflection rate, fewer chats reach agents and the requirement falls before shrinkage is added. A bot that collects details before the human handoff can also shorten average handle time. Because shrinkage divides the requirement, every agent removed from the requirement saves more than one person on the rota: at 30 percent, 1 ÷ 0.7 = 1.43.

FAQ

What is shrinkage in a call center or live chat team? The share of paid agent time not available for customers, because of breaks, meetings, coaching, training, leave, sickness, lateness or system problems.

How do you calculate shrinkage? Divide the hours agents were paid but not available by total paid hours, and multiply by 100. In our invented example, 40.5 of 200 paid hours is 20.25 percent.

How do you apply shrinkage to staffing? Divide the agents needed by one minus shrinkage. 10 agents at 30 percent is 10 ÷ 0.7 = 14.3, so 15 scheduled. Adding 30 percent to 10 gives 13, which is short.

What is a normal shrinkage percentage? Call Centre Helper reports a professional consensus of 30 to 35 percent for contact centers. That describes large phone operations; a small chat team should use its own measured figure.

What is the difference between planned and unplanned shrinkage? Planned shrinkage is known in advance (breaks, meetings, training, leave) and can be placed in quiet hours. Unplanned shrinkage (sickness, lateness, system outages) can only be covered with a buffer.

Does Erlang C include shrinkage? No. Erlang C gives the agents needed at the moment; shrinkage is applied afterwards. See Erlang C.

Sources

  • Call Centre Helper, What is Call Centre Shrinkage and How to Calculate It? (Jonty Pearce) — callcentrehelper.com/how-to-calculate-shrinkage-90353.htm, read 21 November 2026. Source of the formula, the external and internal categories, the 32.5% annual example, the 30 to 35% consensus and Dimension Data's 35% average, the 70 versus 91 versus 100 example, and the seasonal and time-of-day peaks.
  • Call Centre Helper, Shrinkage Formula — callcentrehelper.com/shrinkage-formula-206969.htm, read 21 November 2026. Source of the AgentTime approach that schedules breaks, lunches and meetings and excludes them from shrinkage.
  • Call Centre Helper, What Is Shrinkage? (Hannah Swankie) — callcentrehelper.com/what-is-shrinkage-208983.htm, read 21 November 2026. Source of the definition as time agents are unavailable despite being scheduled.
  • WFM Labs wiki, Shrinkage — wiki.wfmlabs.org/wiki/Shrinkage, read 21 November 2026 (page last edited 16 October 2026). Source of the paid-time formula, the planned and unplanned split, the approximate totals by center size and the 50 ÷ 0.7 = 72 example.
  • Chatbotscape evaluation methodology. /methodology (continuously updated).